Project Intelligence Suite

Project Intelligence.
Computational Examples
from Real GCs.

Every tool is calibrated against real project data from Nunn Construction — 40+ years of commercial GC work in Colorado. Cost models, schedule benchmarks, and scope frameworks derived from actual healthcare, education, and municipal projects.

Avg Project Value

$16.9M

Avg EMR (Safety)

0.67

Delivery Methods

CM/GC · DB

Project Types

Healthcare · Education · Municipal

Nunn Construction · Colorado Springs

Real Projects. Real Intelligence.

Nunn Construction has delivered commercial projects in Colorado since 1983 with a 0.67 EMR — well below the industry average of 1.0. Select a project to see computational intelligence derived from actual project data.

UCHealth Grandview Medical Center
Colorado Springs, CO
22 months
48,000 SF

$18.4M

Contract Value

94,200

Labor Hours

14

Subcontractors

48

Avg Daily Crew

6

Change Orders

Cost/SF

$383

Monthly Burn Rate

$836K

Safety EMR

0.67

Nexus Intelligence

Nexus identified $210K in mechanical coordination savings by front-loading BIM clash detection in preconstruction.

Free Intelligence Tools

Compute It. Ship It. No Signup Required.

Six production-grade tools open to any GC, PM, or safety team — each one calibrated against Davis-Bacon wages, CSI MasterFormat, and AIA contract standards.

Cost Estimator
Davis-Bacon

Compute GMP range using CSI divisions, local labor rates, and productivity benchmarks. Outputs cost/SF by trade with contingency bands.

Real Example — Nunn Construction

Healthcare, 48k SF → $18.4M GMP at $383/SF blended (MEP-heavy)

Project Type

Labor Zone (Davis-Bacon)

Project Lifecycle

Seven Phases. Zero Gaps.

BuildSafe orchestrates every phase from go/no-go through final lien waiver. Each phase has dedicated tools, deliverables, and AI-assisted checkpoints.

Phase 1
Preconstruction
4–12 wks
  • Feasibility & site due diligence
  • Conceptual estimating
  • Subcontractor prequalification
  • Go/No-Go scoring

Preconstruction Report + GMP Range

Phase 2
Design Development
8–20 wks
  • DD-level estimate
  • Value engineering log
  • Scope lock & spec review
  • Permit strategy

100% DD Estimate + VE Log

Phase 3
Procurement
4–8 wks
  • ITB packages
  • Sub bid leveling
  • Long-lead procurement
  • Contract awards

Fully Executed Subcontracts

Phase 4
Mobilization
2–4 wks
  • Site logistics plan
  • Safety orientation
  • Permit issuance
  • Baseline schedule publish

Signed Safety Plans + Baseline CPM

Phase 5
Construction
12–36 mos
  • Daily logs & RFIs
  • Submittals & shop drawings
  • Quality inspections
  • EAC tracking

Weekly Progress Reports + EAC

Phase 6
Commissioning
4–8 wks
  • Systems testing
  • Punch list execution
  • Owner training
  • Certificate of Occupancy

Cx Reports + CO Documentation

Phase 7
Closeout
2–6 wks
  • As-built drawings
  • O&M manuals
  • Lien waivers
  • Final pay app

Closeout Package + Final AIA G702

Industry Safety Standard · 0.67 EMR Platform

Your safety team. Your subs.
One intelligence platform.

Purpose-built for GCs, safety directors, PMs, and field supers. From preconstruction through closeout — all tools work free. No credit card. No account required.